East end of the tent, showing tent heaters and food service tent in the
distance. EPS provided electrical distribution services for heaters and
other equipment located around the tent.
![]()
Main entry area, during installation. Guests walked down the long canopy on
the right into the cocktail area. Coat check is in black walled tents.
![]()
Inside view showing the concrete berm that was
installed to prevent rain water from flowing into the tent.
Berm was not high enough to prevent the first high-tide flooding.
![]()
Installation proceeds on the other non-rain day.
3/10/98