Generators on pier 30-32

EPS provided two 350kVA & two 40kVA generators
for lighting & sound, as wellas providing distribution
equipment for heaters, dressing room outlets and
power for support areas.


Tents and backstage area

Backstage support canopies housed tech offices, construction shops and equipment.
The weather was so bad that installation of these tents was delayed over a week.
EPS cable ramps in foreground floated away during the storm!


Janitorial crews working before the show

EPS provided janitorial crews to clean the carpet before the show.
Cocktail area to the right of the main entrance. Coat check is located
behind the black drapes.

Cocktail area just left of the main entrance. Clear tent allowed guests to see
striking views of the Bay Area. EPS crews assisted with carpet rolls before
and after the event.

More

Home

2/22/98