Radiance of the Seas
Pier 30-32 September 2008
EPS provided a wide range of services and equipment for the Radiance of the Seas
visit to Pier 30-32 in September 2008 for the Port of San Francisco and
Metropolitan Stevedore Company.EPS provided a 100' x 120' clear span structure to act as a passenger terminal,
outfitting it with tables, chairs, lights and electrical services.Electrical distribution system, with generator backup, powered lighting
and security equipment in the tent.Restroom trailer.
EPS office truck served as our base of operations during our week at Pier 30-32.
EPS crews directed traffic on Pier 32. EPS equipment included fence, light towers and cones.
Radiance of the Seas passengers making the long haul to the street.
Since there were three cruise ships in town that day,
cabs were difficult to get.Window washer rig.